{"id":2341753157,"title":"The Black Diamond Railway (Vol.1)","handle":"black_diamond_railway_vol_1","description":"\u003cul\u003e\n\u003cli\u003eWidescreen format\u003c\/li\u003e\n\u003cli\u003e73min\u003c\/li\u003e\n\u003cli\u003eDVD\u003c\/li\u003e\n\u003c\/ul\u003e\n[TABS]\n\u003ch5\u003eFeatures:\u003c\/h5\u003e\n\u003cp\u003eTable of Contents\u003c\/p\u003e\n\u003cp\u003eCh. Title\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003eIntroduction\u003c\/li\u003e\n\u003cli\u003eTrain Room Description\u003c\/li\u003e\n\u003cli\u003eLayout Description Middle Level\u003c\/li\u003e\n\u003cli\u003ePRR K-4 Train Action\u003c\/li\u003e\n\u003cli\u003eLayout Description Top Level\u003c\/li\u003e\n\u003cli\u003eTrain action on Top Level\u003c\/li\u003e\n\u003cli\u003eLayout description Bottom Level\u003c\/li\u003e\n\u003cli\u003eControls\u003c\/li\u003e\n\u003cli\u003eBenchwork\u003c\/li\u003e\n\u003cli\u003eSteam Era medly of Train Action\u003c\/li\u003e\n\u003cli\u003eTrack Work\u003c\/li\u003e\n\u003cli\u003eBig Boy Train Action\u003c\/li\u003e\n\u003cli\u003eMountain Construction Stage 1\u003c\/li\u003e\n\u003cli\u003eMountain Construction Stage 2\u003c\/li\u003e\n\u003cli\u003eMountain Construction Stage 3\u003c\/li\u003e\n\u003cli\u003eModern Era medly of Train Action\u003c\/li\u003e\n\u003cli\u003eScenery (Ground Cover)\u003c\/li\u003e\n\u003cli\u003eBallast\u003c\/li\u003e\n\u003cli\u003eFinal Train Action medly\u003c\/li\u003e\n\u003cli\u003eConclusion\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch5\u003e\u003cstrong\u003eOverview:\u003c\/strong\u003e\u003c\/h5\u003e\n\u003cp\u003eThis original video is already a classic.  A great combination of how-to and fun train action.  Learn construction details namely for the mountains and scenery in this part and watch some great videography of some huge scale steam operating on the Black Diamond Railway.\u003c\/p\u003e\n\u003ch5\u003ePreview:\u003c\/h5\u003e\n\u003cp\u003e\u003ciframe width=\"560\" height=\"315\" src=\"https:\/\/www.youtube.com\/embed\/OtHbTJmyQAQ\" frameborder=\"0\" allow=\"accelerometer; autoplay; encrypted-media; gyroscope; picture-in-picture\" allowfullscreen=\"\"\u003e\u003c\/iframe\u003e\u003c\/p\u003e\n[\/TABS]","published_at":"2017-04-18T14:21:47-04:00","created_at":"2015-10-05T14:08:10-04:00","vendor":"Toy Trains on Track","type":"Media","tags":["in-stock","media","spo-enabled","toy-trains-on-track","under-50"],"price":2495,"price_min":2495,"price_max":2495,"available":true,"price_varies":false,"compare_at_price":2495,"compare_at_price_min":2495,"compare_at_price_max":2495,"compare_at_price_varies":false,"variants":[{"id":6778155461,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"TToT-BDR-V1","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"The Black Diamond Railway (Vol.1)","public_title":null,"options":["Default Title"],"price":2495,"weight":0,"compare_at_price":2495,"inventory_quantity":3,"inventory_management":"shopify","inventory_policy":"deny","barcode":"700261226514"}],"images":["\/\/cdn.shopify.com\/s\/files\/1\/1011\/0560\/products\/front_op_426x600_877bad59-6365-4f15-8008-3ac51e7942a0.jpg?v=1571438961"],"featured_image":"\/\/cdn.shopify.com\/s\/files\/1\/1011\/0560\/products\/front_op_426x600_877bad59-6365-4f15-8008-3ac51e7942a0.jpg?v=1571438961","options":["Title"],"media":[{"alt":null,"id":2370529722503,"position":1,"preview_image":{"aspect_ratio":0.71,"height":600,"width":426,"src":"https:\/\/cdn.shopify.com\/s\/files\/1\/1011\/0560\/products\/front_op_426x600_877bad59-6365-4f15-8008-3ac51e7942a0.jpg?v=1569975085"},"aspect_ratio":0.71,"height":600,"media_type":"image","src":"https:\/\/cdn.shopify.com\/s\/files\/1\/1011\/0560\/products\/front_op_426x600_877bad59-6365-4f15-8008-3ac51e7942a0.jpg?v=1569975085","width":426}],"content":"\u003cul\u003e\n\u003cli\u003eWidescreen format\u003c\/li\u003e\n\u003cli\u003e73min\u003c\/li\u003e\n\u003cli\u003eDVD\u003c\/li\u003e\n\u003c\/ul\u003e\n[TABS]\n\u003ch5\u003eFeatures:\u003c\/h5\u003e\n\u003cp\u003eTable of Contents\u003c\/p\u003e\n\u003cp\u003eCh. Title\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003eIntroduction\u003c\/li\u003e\n\u003cli\u003eTrain Room Description\u003c\/li\u003e\n\u003cli\u003eLayout Description Middle Level\u003c\/li\u003e\n\u003cli\u003ePRR K-4 Train Action\u003c\/li\u003e\n\u003cli\u003eLayout Description Top Level\u003c\/li\u003e\n\u003cli\u003eTrain action on Top Level\u003c\/li\u003e\n\u003cli\u003eLayout description Bottom Level\u003c\/li\u003e\n\u003cli\u003eControls\u003c\/li\u003e\n\u003cli\u003eBenchwork\u003c\/li\u003e\n\u003cli\u003eSteam Era medly of Train Action\u003c\/li\u003e\n\u003cli\u003eTrack Work\u003c\/li\u003e\n\u003cli\u003eBig Boy Train Action\u003c\/li\u003e\n\u003cli\u003eMountain Construction Stage 1\u003c\/li\u003e\n\u003cli\u003eMountain Construction Stage 2\u003c\/li\u003e\n\u003cli\u003eMountain Construction Stage 3\u003c\/li\u003e\n\u003cli\u003eModern Era medly of Train Action\u003c\/li\u003e\n\u003cli\u003eScenery (Ground Cover)\u003c\/li\u003e\n\u003cli\u003eBallast\u003c\/li\u003e\n\u003cli\u003eFinal Train Action medly\u003c\/li\u003e\n\u003cli\u003eConclusion\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch5\u003e\u003cstrong\u003eOverview:\u003c\/strong\u003e\u003c\/h5\u003e\n\u003cp\u003eThis original video is already a classic.  A great combination of how-to and fun train action.  Learn construction details namely for the mountains and scenery in this part and watch some great videography of some huge scale steam operating on the Black Diamond Railway.\u003c\/p\u003e\n\u003ch5\u003ePreview:\u003c\/h5\u003e\n\u003cp\u003e\u003ciframe width=\"560\" height=\"315\" src=\"https:\/\/www.youtube.com\/embed\/OtHbTJmyQAQ\" frameborder=\"0\" allow=\"accelerometer; autoplay; encrypted-media; gyroscope; picture-in-picture\" allowfullscreen=\"\"\u003e\u003c\/iframe\u003e\u003c\/p\u003e\n[\/TABS]"}

The Black Diamond Railway (Vol.1)

$ 24.95
Maximum quantity available reached.
Product Description
  • Widescreen format
  • 73min
  • DVD

Table of Contents

Ch. Title

  1. Introduction
  2. Train Room Description
  3. Layout Description Middle Level
  4. PRR K-4 Train Action
  5. Layout Description Top Level
  6. Train action on Top Level
  7. Layout description Bottom Level
  8. Controls
  9. Benchwork
  10. Steam Era medly of Train Action
  11. Track Work
  12. Big Boy Train Action
  13. Mountain Construction Stage 1
  14. Mountain Construction Stage 2
  15. Mountain Construction Stage 3
  16. Modern Era medly of Train Action
  17. Scenery (Ground Cover)
  18. Ballast
  19. Final Train Action medly
  20. Conclusion

This original video is already a classic.  A great combination of how-to and fun train action.  Learn construction details namely for the mountains and scenery in this part and watch some great videography of some huge scale steam operating on the Black Diamond Railway.